Infrastructure Improvements, Phase 2

5 Documents in Project

Summary

SCH Number
2008052110
Lead Agency
University of California Santa Cruz
Document Title
Infrastructure Improvements, Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
7/21/2008
Present Land Use
Undeveloped land in drainages / Campus Natural Reserve within developed academic/residential (UCSC 1988 Long Range Development Plan)
Document Description
The proposed project consists of implementation of storm water control improvements at about 33 locations in the Jordan Gulch and Moore Creek Drainages on the UCSC main campus. These natural drainages on the campus, used to convey both natural storm water runoff and runoff from development, are experiencing progressive erosion, and sinkholes within the drainages have become clogged with silt and debris. This has reduced the ability of drainages to infiltrate water. The project would install check dams and step pools, reinforce banks, and implement other measures to restore natural infiltration, reduce siltation and halt progressive erosion. The project is not designed to address any increases in runoff or increase the capacity of existing campus utilities; nor would it increase campus population; it simply would restore the ability of natural drainages to handle existing storm water flows. The project was analyzed in the UC Santa Cruz Infrastructure Improvements Project, Phase 2 Initial Study/Mitigation Negative Declaration, which was certified by the Chancellor of UC Santa Cruz on July 8, 2008.

Contact Information

Name
Sally Morgan
Agency Name
University of California, Santa Cruz
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
McLaughlin Drive and Hagar Road
Zip
95064
Total Acres
7.6
Parcel #
01-011-13
State Highways
1
Schools
Westlake Elementary
Waterways
San Lorenzo River
Township
11S
Range
2W
Base
MDB&M

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes