Infrastructure Improvements, Phase 2
5 Documents in Project
Summary
SCH Number
2008052110
Lead Agency
University of California Santa Cruz
Document Title
Infrastructure Improvements, Phase 2
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Undeveloped land in drainages / Campus Natural Reserve within developed academic/residential (UCSC 1988 Long Range Development Plan)
Document Description
The proposed project consists of storm water control improvements at 33 locations within the Jordan Gulch and Moore Creek drainages on the UCSC campus. These natural drainages on the campus, used to convey both natural storm water runoff and runoff from development, are experiencing progressive erosion. Sinkholes within the drainages have become clogged, with reduced ability to infiltrate water. The project would install check dams and step pools, reinforce banks, clean out sinkholes, and implement other measures to reduce siltation and halt progressive erosion.
Contact Information
Name
Sally Morgan
Agency Name
University of California, Santa Cruz
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
McLaughlin Drive and Hagar Road
Zip
95064
Total Acres
7.6
Parcel #
01-011-13
State Highways
1
Schools
Westlake Elementary
Waterways
San Lorenzo River
Township
11S
Range
2W
Base
MDB&M
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 5 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Rights
Development Types
Other (Storm water erosion control features)
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Noise, Transportation, Vegetation, Wetland/Riparian, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.