Harry Tracy Water Treatment Plant Long-Term Improvements Project

5 Documents in Project

Summary

SCH Number
2008052106
Lead Agency
City and County of San Francisco
Document Title
Harry Tracy Water Treatment Plant Long-Term Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
11/29/2010
Present Land Use
Open space in San Mateo Co GP
Document Description
The Project as approved by the SFPUC seeks to meet WSIP levels of service for water quality and delivery reliability, seismic reliability, and other improvements necessary to the enhance the operation of the HTWTP. The facility improvements include a new treated water reservoir, treatment process and chemical storage facility upgrades, and site improvements (pipelines, roads, slope stability, and erosion control). The project also includes decommissioning two existing treated water reservoirs, demolition of some facilities, and removal of equestrian facilities. The treatment process would generally be the same even with the proposed improvements. The primary differences would be to solids handling, whereby solids from the sludge holding tank would be transferred to a solids dewatering facility before being trucked off site, and to the treated water storage, which would occur in a single new tank north of the main plan site instead of two tanks southeast of the main plant. The HTWTP is located on 52.3 acres in an unincorporated area of San Mateo County just east of Interstate 280 (I-280) near the City of San Bruno and the City of Millbrae. A small portion of the site is within the City of Millbrae. Construction is anticipated to start early 2011 and last approximately 4 years.

Contact Information

Name
Tim Johnston
Agency Name
City and County of San Francisco, Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Millbrae, San Bruno
Counties
San Mateo
Cross Streets
Crystal Springs Rd
Zip
94066
Total Acres
52.3
Parcel #
093120050
State Highways
SR 35, I-280
Railways
Caltrain
Airports
SF Int'l
Schools
Meadows Elementary, etc.
Waterways
San Andreas Reservoir, El Zanjon Creek

Notice of Determination

Approving Agency
San Francisco Public Utilies Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.