Harry Tracy Water Treatment Plant Long-Term Improvements Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008052106
- Lead Agency
- San Francisco, City and County of (City and County of San Francisco)
- Document Title
- Harry Tracy Water Treatment Plant Long-Term Improvements Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/8/2010
- Present Land Use
- Open space in San Mateo Co GP
- Document Description
- The Project as approved by the SFPUC seeks to meet WSIP levels of service for water quality and delivery reliability, seismic reliability, and other improvements necessary to the enhance the operation of the HTWTP. The facility improvements include a new treated water reservoir, treatment process and chemical storage facility upgrades, and site improvements (pipelines, roads, slope stability, and erosion control). The project also includes decommissioning two existing treated water reservoirs, demolition of some facilities, and removal of equestrian facilities. The treatment process would generally be the same even with the proposed improvements. The primary differences would be to solids handling, whereby solids from the sludge holding tank would be transferred to a solids dewatering facility before being trucked off site, and to the treated water storage, which would occur in a single new tank north of the main plan site instead of two tanks southeast of the main plant. The HTWTP is located on 52.3 acres in an unincorporated area of San Mateo County just east of Interstate 280 (I-280) near the City of San Bruno and the City of Millbrae. A small portion of the site is within the City of Millbrae. Construction is anticipated to start early 2011 and last approximately 4 years.
- Contact Information
-
Tim Johnston
City and County of San Francisco, Planning Department
1650 Mission Street, Suite 400
San Francisco, CA 94103
Phone : (415) 575-9035
Location
- Coordinates
- 37°36'22.16"N 122°25'33.72"W
- Cities
- Millbrae San Bruno
- Counties
- San Mateo
- Cross Streets
- Crystal Springs Rd
- Zip
- 94066
- Total Acres
- 52.3
- Parcel #
- 093120050
- State Highways
- SR 35, I-280
- Railways
- Caltrain
- Airports
- SF Int'l
- Schools
- Meadows Elementary, etc.
- Waterways
- San Andreas Reservoir, El Zanjon Creek
Notice of Determination
- Approving Agency
- San Francisco Public Utilies Commission
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Planning Information Center 1660 Mission Street, Suite 400 San Francisco, CA 94103
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.