Water Pipeline to Interconnect the Monte Grande, Soulsbyville, Willow Springs and Curtis Creek Ranch Service Areas

3 Documents in Project

Summary

SCH Number
2008052100
Lead Agency
Tuolumne Utilities District
Document Title
Water Pipeline to Interconnect the Monte Grande, Soulsbyville, Willow Springs and Curtis Creek Ranch Service Areas
Document Type
NOD - Notice of Determination
Received
Posted
7/3/2008
Present Land Use
Residential, Estate Residential, Rural Residential / R-1, RE-1, RE-2, RE-5, O / LDR, ER, HR, RR
Document Description
The Tuolumne Utilities District is proposing to construct approximately 5,455 linear feet of 8-inch diameter water pipeline along Soulsbyville Road to interconnect the Monte Grande Water System to the Crystal Falls - Willow Springs Water System. The interconnection is proposed for the purpose of supplementing the water capacity of the Crystal Falls - Willow Springs Water System with supply from a new water treatment plant and storage tank which is being constructed in the Monte Grande Water System.

Contact Information

Name
Peter Kampa
Agency Name
Tuolumne Utilities District
Contact Types
Lead/Public Agency

Location

Counties
Tuolumne
Cross Streets
Soulsbyville Road, Black Oak Road, Overlook Trail, Curtis Circle, Draper Mine Road
Zip
95372
State Highways
108
Railways
Sierra Railroad
Schools
Soulsbyville Elementary
Waterways
Curtis Creek
Township
2N
Range
15E
Section
36
Base
MDB&M
Other Location Info
City/Nearest Community: Soulsbyville

Notice of Determination

Approving Agency
Tuolumne Utilities District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print