L.L. Anderson Dam Spillway Modification Project

3 Documents in Project

Summary

SCH Number
2008052096
Lead Agency
Placer County Water Agency
Document Title
L.L. Anderson Dam Spillway Modification Project
Document Type
NOD - Notice of Determination
Received
Posted
10/24/2008
Present Land Use
Project area zoned: Timberland; Surrounding areas zoned Agriculture, Resource Protection, Rural Residential, Timberland, Urban Uses (1994)

Document Description
SAA #1600-2008-0139-R2 Widening of the existing spillway of the L.L. Anderson dam on French Meadows Reservoir. In addition the dam crest parapet wall will be replaced and raised to pass a calculated Probable maximum Flood (PMF). The spillway will be widened by use of explosives and machinery to fracture adjacent rock to allow for its removal. The existing spillway structure would ultimately be replaced and enlarged through demolition and excavation.

Contact Information
Robert C. Hosea
Department of Fish and Game
Sacramento Valley and Sierra Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670

Phone : (916) 704-9156

Location

Coordinates
39°6'40"N 120°28'13"W
Counties
Placer
Zip
95631
Total Acres
15
Parcel #
067-160-104-510
Waterways
Middle Fork American River
Township
15N
Range
13E
Section
36
Other Location Info
French Meadows reservoir

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Placer County Water Agency 24625 Harrison Street Foresthill, California 95631

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search