Pacific Gas and Electric Line 2 In-Line Repair Project

2 Documents in Project

Summary

SCH Number
2008052095
Lead Agency
Fish & Game #3
Document Title
Pacific Gas and Electric Line 2 In-Line Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
8/19/2008
Present Land Use
Agricultural
Document Description
Pacific Gas & Electric Company proposes to perform a direct external examination of two pipeline sites, one located in rural southern Contra Costa County and the other located in rural northern Alameda County. Project construction activities include the excavation of the high pressure gas pipeline and removal of the coating if necessary, repair, recoating and restoration of the disturbed area in areas 20' long by 20' wide and 10' long by 20' wide. The project area includes site 2, located in a grassland basin with marginal wetland characteristics in rural southern Contra Costa County approximately 1000 feet east of New Vasco Road and approximately 1600 feet north of 6901 Armstrong Road, (Latitude = 73 degree 50'35", Longitude = 121 degree 38'34"). This site is approximately 1600 feet west of Bruns Avenue and approximately 3000 feet north of the intersection of Bruns Avenue and Kelso Road, (Latitude = 37 degree 48' 11", Longitude = 121 degree 36' 38"). The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1602-2007-0375-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Richard Gigliotti/Pacific Gas and Electric Company.

Contact Information

Name
Suzanne Gilmore
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Byron
Counties
Alameda, Contra Costa
Cross Streets
Byron Highway
Zip
94513
Total Acres
0.02
Parcel #
003-160-006-7, 099B-7010-001-02
State Highways
4
Airports
Byron Airport
Waterways
Brushy Creek
Township
1S
Range
3E
Section
16SE,
Other Information
Section (cont): 35 NE

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print