Pool Creek Streambank Restoration Project

Summary

SCH Number
2008052088
Lead Agency
Sotoyome Resource Conservation District
Document Title
Pool Creek Streambank Restoration Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
Agricultural parcel Zoning: Recreation General Plan: Park
Document Description
The project is designed to stabilize and revegetate approximately 526 linear feet of creek bank to reduce the impact of sediment delivery to the creek. Bank stabilization techniques will include excavation and resloping of the stream bank (276 cubic yards cut), and installation of minimal rock riprap (281 cubic yards), biodegradable erosion control fabric, and heavy native planting. A rock barb (27 cubic yards) will be installed to redirect flow in order to minimize erosion along a stream bend. The project also includes installation of four rock cross-vanes (136 cubic yards of rock) in order to alter the stream gradient and halt the progression of an existing headcut.

Contact Information

Name
Kara Heckert
Agency Name
Sotoyome Resource Conservation District
Contact Types
Lead/Public Agency

Location

Cities
Windsor
Counties
Sonoma
Cross Streets
Shiloh Road and Conde Lane
Zip
95492
Total Acres
0.25
Parcel #
163-130-011
State Highways
101
Railways
1 railway, not operating
Airports
Sonoma County Airport
Waterways
Pool Creek, Windsor Creek, Faught Creek
Township
8N
Range
9W
Section
19

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, North Coast Region 1 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Emergency Services, California, Office of Historic Preservation, Resources Agency, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
Development Types
Other (Streambank restoration)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print