Final Response Plan for the Santa Clara Square Retail

13 Documents in Project

Summary

SCH Number
2008052065
Lead Agency
City of Santa Clara
Document Title
Final Response Plan for the Santa Clara Square Retail
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2014
Document Description
The clean up project that was subject to approval by the Department of Toxic Substances Control (DTSC) is part of a larger redevelopment project, the Augustine Bowers Office Park, that was previously approved by the City of Santa Clara as the CEQA lead agency. This cleanup project consists of approval of a Final Response Plan by DTSC to protect human health and the envrionment by remediating the soil contaminated with arsenic, lead, dieldrin, total petroleum hydrocarbons as diesel (TPHd), and total petroleum hydrocarbons as motor oil (TPHmo) on the Santa Clara Square Retail (Site) prior to its redevelopment. Cleanup activities would include excavation of an estimated 27,000 cubic yards of soil from the area where arsenic, lead, dieldrin are present in soil at concentrations above the Site cleanup goals to depths up to 3.5 feet below the base rock that underlies existing pavement, and consolidation of the excavated contaminated soil on-Site, beneath a "cap" (i.e. paved parking lots, buildings and landscaped areas). The response action activities will likely occur in two phases.

Contact Information

Name
Jayantha Randeni
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Santa Clara
Counties
Santa Clara
Cross Streets
Bowers Avenue, Augustine Blvd., Scott Blvd.
Zip
95050
Parcel #
216-45-009, -011, -014, -019, -027, -028, -031, -032
State Highways
101, 237, 82
Railways
UPRR,SPRR
Airports
San Jose International
Schools
Mission College
Waterways
San Tomas Aquino & Calabazas Creek, Guadalupe River

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print