The Erosion Repairs of 13 Bank Protection Sites, 2008 and 2009, Sacramento River Bank Protection Project

4 Documents in Project

Summary

SCH Number
2008052034
Lead Agency
Central Valley Flood Protection Board
Document Title
The Erosion Repairs of 13 Bank Protection Sites, 2008 and 2009, Sacramento River Bank Protection Project
Document Type
FIN - Final Document
Received

Document Description
Overall, the project would consist of (1) reinforcing the bank toe with a total of 8,000 lineal feet of riprap, covering an area of 18.5 acres; (2) placing a mixture of riprap and soil (mixture of sand and silt suitable for plant growth) on upper banks and tops of the lower bank riprap to create riparian benches above the mean summer water elevation, covering a total area of 10.63 acres; and (3) planting the benches and upper banks with vegetation to provide bank stabilization and riparain habitat. In-stream woody material would also be placed along the sites to provide bank protection and aquatic habitat.

Contact Information
Mike Dietl
U.S. Army Corps of Engineers
1325 J Street
Sacramento, CA 95814-2922

Phone : (916) 557-6742
Michael.L.Dietl@usace.army.mil

Location

Counties
Glenn Sacramento Solano Sutter Yolo

Notice of Completion

Development Type
Other (Levee bank erosion repair and revegetation)
Project Issues
Air Quality Archaeologic-Historic Biological Resources Geologic/Seismic Noise Recreation/Parks Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Land Use Cumulative Effects Other Other Issues: Environmental Justice

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.