Lake and Streambed Alteration Agreement No. R1-08-0362 Petrolia Implementation Project

38 Documents in Project

Summary

SCH Number
2008052026
Lead Agency
Fish & Game #2
Document Title
Lake and Streambed Alteration Agreement No. R1-08-0362 Petrolia Implementation Project
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2008
Document Description
The project proposes the following road upgrade treatments: reshaping of approximately 9 miles of road at 24 sites with a total of 100 rolling dips, replacement of culverts at 57 sites, installation of armored fords at 17 sites, construction of armored critical dips at 16 sites, and installation of two bottomless arched culverts; deommissioning approximately 1.5 miles of road along four segments including the excavation of 24 stream crossings; instream treatments; construction of willow and riprap structures at six sites and construction of 16 boulder wing deflectors with large wood at eight sites.

Contact Information

Name
Trevor Tollefson
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Various coastal counties
Other Location Info
Mainstem Mattole River, North Fork Mattole River, Wild Turkey Creek, Conklin Creek, Mill Creek, Upper Mill Creek, Stansberry Creek, Indian Creek, and Clear Creek, tributaries to the Mattole River

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print