Hermit Springs Forest Fire Station Utility Upgrade Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008052025
- Lead Agency
- California Department of Forestry and Fire Protection (CAL FIRE)
- Document Title
- Hermit Springs Forest Fire Station Utility Upgrade Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/12/2008
- Present Land Use
- The property is currently zoned as a Forest Fire Station and the use would not change.
- Document Description
- Upgrading the utilities at an existing forest fire station. The generator and solar systems would be replaced and the potable water supply improved through the installation of a pump at the existing collection pond at nearby Hermit Springs. A new water line would be installed connecting this pump to the water tanks at the station.
- Contact Information
-
Dan Foster
Cal Fire
Lead/Public Agency
P.O. Box 944246
Sacramento, CA 94244-2460
Phone : (916) 653-0839
Location
- Counties
- Calaveras
- Cross Streets
- Hermit Springs Forest Fire Station, 18 miles out the Winton Road from Highway 26
- Zip
- 95255
- Total Acres
- 5
- State Highways
- State Highway 26
- Waterways
- Blue Creek, Forest Creek
- Township
- 7N
- Range
- 16E
- Section
- 29
- Base
- MDB&M
- Other Location Info
- City/Nearest Community: West Point
Notice of Determination
- Approving Agency
- Department of Forestry and Fire Protection
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- California Department of Forestry and Fire Protection Resource Management - Environmental Protection P.O. Box 944246 Sacramento, CA 94244-2460
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.