Pickerel Floodplain Restoration

4 Documents in Project

Summary

SCH Number
2008052010
Lead Agency
Solano County Water Agency
Document Title
Pickerel Floodplain Restoration
Document Type
NOD - Notice of Determination
Received
Posted
7/11/2008
Present Land Use
Open Space / General Agricultural
Document Description
The applicant proposes to restore functional floodplain elevation to the north bank of Putah Creek for 800 feet downstream of the Putah Diversion Dam. Sediment would be removed from the floodplain and used to fill the edge of the north bank on existing high ground that is out of the active channel. The project features a rock weir above an island in the channel that will serve as a gravel retaining structure for salmon spawning habitat. One hundred cubic yards of 3-inch minus gravel will be placed upstream of the rock weir. The weir and gravel bed will serve as a crossing during construction and afterward as a low flow crossing for maintenance of the north bank. In the winter months, the gravel bed will enhance salmon spawning habitat. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2008-0205-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Chris Lee, Solano County Water Agency.

Contact Information

Name
Anna Holmes
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Winters
Counties
Solano
Cross Streets
Putah Creek Road and Canal Lane
Zip
95694
Total Acres
2
Parcel #
0103060090
State Highways
128
Waterways
Putah Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print