Jaybird Tunnel Intake Structure Debris Removal Project
19 Documents in Project
Summary
SCH Number
2008052009
Lead Agency
Sacramento Municipal Utility District
Document Title
Jaybird Tunnel Intake Structure Debris Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
3/25/2024
Document Description
SMUD will remove approximately 25 cubic yards of woody debris and rocks/ boulders that are currently restricting flow into the tunnel. To perform the debris removal, SMUD requested a temporary reservoir level modification for Junction Reservoir to allow the work to be performed above the water surface. The target elevation to perform the work is elevation 4,370 feet. All accumulated trashrack woody debris will be lifted out of the reservoir and hauled offsite as necessary, rocks/boulders will be either removed from the reservoir and stockpiled or pulled away from the intake rack and repositioned in the reservoir away from the intake rack, depending on field conditions. No construction activities will be performed within the water body.
Contact Information
Name
Sara Gevorgyan
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Counties
El Dorado
Regions
Northern California
Other Location Info
Junction Reservoir
Notice of Determination
Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
https://ceqanet.opr.ca.gov/Project/2008052009
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.