Water Quality Certification Amendment Related to Conditions 1.K. and 5.H. for the Upper American River Hydroelectric Project

11 Documents in Project

Summary

SCH Number
2008052009
Lead Agency
Sacramento Municipal Utility District
Document Title
Water Quality Certification Amendment Related to Conditions 1.K. and 5.H. for the Upper American River Hydroelectric Project
Document Type
NOD - Notice of Determination
Received

Document Description
SMUD proposes to modify the operation of the project, as described and analyzed in the FEIS and Final CEQA Supplement, by amending Conditions 1.K. (Minimum Instream Flows, South Fork American River below Slab Creek Reservoir Dam) and Condition 5.H. (Reservoir Levels, Interim Modifications) of the UARP water quality certification. Proposed amendments to Condition 1.K. will postpone implementation of increased minimum instream flows in the South Fork American River below Slab Creek Reservoir Dam while necessary facility modifications are completed. Proposed amendments to condition 5.H. will expand the basis for temporary reservoir level modification to include maintenance and construction activities upon receipt of Deputy Director approval.

Contact Information
Savannah Downey
SWRCB
1001 I Street
Sacramento, CA 95814

916-322-1585

Location

Coordinates
38°46'44.21"N 120°40'53.15"W
Cities
Placerville
Counties
El Dorado Sacramento
Cross Streets
Rubicon R., Silver Ck, South Fork American River, lines running E to W from Loon Lake Powerhouse
Zip
95667, 709
Total Acres
9,150 & 283
Parcel #
Many
Waterways
Rubicon River, Silver Creek, and South Fork American River
Township
11N
Range
12E
Section
19,20,
Base
MDB&M
Other Location Info
City/Nearest Community: Camino
Other Information
Sections: 28-30

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1001 I Street, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes