Modernization of Coronita Elementary School
2 Documents in Project
Summary
SCH Number
2008051107
Lead Agency
Corona-Norco Unified School District
(CNUSD)
Document Title
Modernization of Coronita Elementary School
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2008
Present Land Use
School / (S) School / Mixed Use
Document Description
Modernization of Coronita Elementary School, which will include: (1) replacement of multi-purpose building with new multi-purpose building, Kindergarten classroom, and lunch shelter, and existing hardscape with new hardscape area; (2) construction of new service ramp for food cart delivery, entry pavilion, and plaza; (3) installation of new security fencing and electronic marquee sign; (4) renovation of toilet facilities; (5) drainage work; (6) re-seal and re-stripe existing parking lot and add lights; (7) permanent relocation of two relocatable classrooms and a shade structure to other locations in the campus; (8) temporary relocation of relocatable food service building to another location in the campus; and (9) permanent removal of two relocatable buildings.
Contact Information
Name
Lynne Murray
Agency Name
Corona-Norco Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Corona
Counties
Riverside
Cross Streets
Via del Rio and Kirkwood Drive
Zip
92882
Parcel #
103-200-001
State Highways
91 Freeway
Railways
Metrolink
Schools
Chavez Elementary
Township
3S
Range
7W
Section
27, 34
Base
SBB&M
Notice of Determination
Approving Agency
Corona-Norco Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.