Subsurface Intake System Feasibility Investigation Test Slant Well

5 Documents in Project

Summary

SCH Number
2008051050
Lead Agency
Orange County Municipal Water District
Document Title
Subsurface Intake System Feasibility Investigation Test Slant Well
Document Type
NOD - Notice of Determination
Received
Posted
4/2/2012
Document Description
In 2006, MWDOC successfully constructed a fully buried 12" diameter, 350' long test slant well on Doheny State Beach. Long-term testing is needed to validate and fine tune the groundwater model, to verify the anticipated flow splits between brackish and ocean water, establish water quality and microbial parameters, and to establish a full-scale desalination process design. Phase 3 pilot-plant testing and water quality testing will measure changes in salinity and other water quality parameters affecting Reverse Osmosis process performance. The State Lands Commission action is two-year Extended Lease through May 31, 2014.

Contact Information

Name
Drew Simpkin
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Dana Point
Counties
Orange
Cross Streets
25300 Dana Point Harbor Drive
Zip
92629
State Highways
1 (Pacific Coast Highway)
Schools
St. Edward School
Waterways
Pacific Ocean
Township
8S
Range
8W

Notice of Determination

Approving Agency
California States Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print