Blackie Road Safety Improvements Project (Re-issuance of California Endangered Species Act Incidental Take Permit No. 2081-2013-034-04 (ITP))

8 Documents in Project

Summary

SCH Number
2008051009
Lead Agency
Monterey County
Document Title
Blackie Road Safety Improvements Project (Re-issuance of California Endangered Species Act Incidental Take Permit No. 2081-2013-034-04 (ITP))
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed Project involves the construction of safety improvements to an approximately 1.39-mile segment of Blackie Road that are intended to reduce the number and severity of accidents on the roadway. Road improvements include the removal of 15 non-native eucalyptus and 52 native coast live oak trees to accommodate the shoulder improvements; rehabilitation of the existing roadway; pavement of four-foot roadway shoulders; pavement of side road segments to provide transitional approaches from the improved roadway surface to existing driveways; replacement of existing unlined drainages with storm drain pipes under the shoulder, replacement of existing utility poles; installation of thermoplastic markings and vibrational treatment along the road shoulders, incorporation of a centerline rumble strip; and installation of reflectorized signage in advance of curves.

Contact Information
Brandon Sanderson
Department of Fish and Wildlife (CDFW)
Central Region 1234 East Shaw Avenue
Fresno, CA 93710

805 594 6141

Location

Coordinates
36°46'38"N 121°41'29"W
Counties
Monterey
Cross Streets
U.S. Highway 101 and Merritt Street
Zip
93907
Total Acres
16.8
State Highways
U.S. 101
Railways
No
Airports
No
Schools
No
Waterways
Merritt Lake
Other Location Info
City/Nearest Community: Prunedale

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Monterey County Resource Management Agency 168 West Alisal Street, 2nd Floor Salinas, CA 93901

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search