PG&E Topock Compressor Station Environmental Investigation and Cleanup Project
Summary
- SCH Number
- 2008051003
- Lead Agency
- Toxic Substances Control, Department of (Department of Toxic Substances Control)
- Document Title
- PG&E Topock Compressor Station Environmental Investigation and Cleanup Project
- Document Type
- FIN - Final Document
- Received
- Present Land Use
- Open Space/Resource Conservation/Institutional
- Document Description
- Notes: 1 CD Groundwater beneath and near the Topock Compressor Station (TCS) has been contaminated by chemicals associated with historical wastewater discharge from station operations related to compression of natural gas in areas known as Bat Cave Wash and East Ravine. The Groundwater Remediation Project, as analyzed and approved in the 2011 Groundwater FEIR and the 2013 Addendum to the EIR, involves manipulation of subsurface water flow to move a contaminated groundwater plume with Cr(VI) and other chemicals of potential concern, originating from past operations at the TCS, through a treatment zone.
- Contact Information
-
Mr. Aaron Yue
Department of Toxic Substances Control
Geological Services Branch 5796 Corporate Ave.
Sacramento, CA 90630
Phone : (714) 484-5439
Location
- Coordinates
- 34°43'15"N 114°29'45"W
- Cities
- Needles
- Counties
- San Bernardino
- Cross Streets
- National Trails Highway
- Zip
- 92363
- Total Acres
- 128.5
- Parcel #
- Various
- State Highways
- SR 66, I-40
- Railways
- BNSF Railroad
- Waterways
- Colorado River
- Township
- 7N
- Range
- 24E
- Section
- 5,6,7,
- Base
- MDB&M
- Other Location Info
- Topock, Arizona
- Other Information
- Section: 9
Notice of Completion
- Development Type
- Waste Treatment:Hazardous (groundwater)
- Local Action
- Other Action Other Action: Groundwater Cleanup
- Project Issues
- Aesthetic/Visual Archaeologic-Historic Biological Resources Noise Soil Erosion/Compaction/Grading Toxic/Hazardous Vegetation Water Quality Water Supply Wetland/Riparian Cumulative Effects Other Other Issues: Utilities, Service Systems, and Energy
Attachments
- Environmental Document
- 2008051003_Draft Soil Engineering Evaluation_Cost Analysis PDF 3151 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.