Two Electrical Improvement Projects at the Henry J. Mills Water Treatment Plant - Electrical System Reliability Study and Seismic Upgrades Preliminary Design

Summary

SCH Number
2008048177
Public Agency
Metropolitan Water District of Southern California
Document Title
Two Electrical Improvement Projects at the Henry J. Mills Water Treatment Plant - Electrical System Reliability Study and Seismic Upgrades Preliminary Design
Document Type
NOE - Notice of Exemption
Received
Posted
4/11/2008
Document Description
Appropriate funds for two electrical improvement projects. The first includes a study to evaluate options to improve electrical system reliability and maintainability. The second includes preliminary design phase activities for seismic upgrades of electrical buildings no. 1 and 2; with activities consisting of detailed structural analyses, environmental documentation preparation, and preliminary construction cost estimate development.

Contact Information

Name
William Fong
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15306 - Class 1 & 6
Reasons for Exemption
The proposed project consists of the data collection, research, experimental management, and resource evaluation activities which do not result in a serious or major disturbance to the environmental resource.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print