Creekside Landing (Fremont File #s: PLN2008-0017; PLN2009-00187)
5 Documents in Project
Summary
SCH Number
2008042116
Lead Agency
City of Fremont
Document Title
Creekside Landing (Fremont File #s: PLN2008-0017; PLN2009-00187)
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2014
Document Description
Proposed project consists of the installation, use, operation, and maintenance of new utility conduit pipelines totaling 90 diameter-inches for the installation of one 4-inch inside diameter (ID) gas pipeline, one 16-inch ID water pipeline, one 12-inch ID water pipeline, and two 6-inch ID electrical conduits, one 6-inch ID telephone conduits, and two 4-inch ID expansion conduits. The CA State Lands Commission action is an issuance of a 25-year General Lease - Right of Way Use through June 18, 2034.
Contact Information
Name
Jonathan Sampson
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fremont
Counties
Alameda
Cross Streets
Dixon Landing Road / N. McCarthy Boulevard
Zip
94538
Total Acres
147
Parcel #
519-0828-002-14, -18
State Highways
I-880; SR-262
Railways
Union Pacific
Schools
Fremont Unified
Waterways
Scott Creek, Flood Channel B, Old Coyote Creek
Township
5S
Range
1W
Section
36
Base
Diablo
Other Location Info
Industrial Planning Area
Notice of Determination
Approving Agency
California State lands Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.