Creekside Landing (Fremont File #s: PLN2008-00117; PLN2009-00187)
5 Documents in Project
Summary
SCH Number
2008042116
Lead Agency
City of Fremont
Document Title
Creekside Landing (Fremont File #s: PLN2008-00117; PLN2009-00187)
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2014
Document Description
The proposed project consists of the development of 524,000 sf of commercial retail uses (Creekside Landing) and the extension of Fremont Boulevard and the San Francisco Bay Trail from Flood Channel B to Dixon Landing Road. The Creekside Landing retail center would feature two freestanding anchors and smaller inline and freestanding retail and restaurants. The retail center would include an internal roadway crossing of Scott Creek. The Fremont Boulevard extension would be four lanes and include two roadways crossing of waterways, one over Scott Creek and the other over Flood Channel B. The Bay Trail would be located on the west side of the roadway. The California State Lands Commission action is an issuance of a 20-year General Lease - Right of Way Use through February 20, 2034, for the installation, use, maintenance, and operation of a 12-inch sanitary sewer pipeline beneath the bed of Scott Creek.
Contact Information
Name
Jonathan Sampson
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fremont
Counties
Alameda
Cross Streets
Dixon Landing Road / N. McCarthy Boulevard
Zip
94538
Total Acres
147
Parcel #
519-0828-002-14, -18
State Highways
I-880; SR-262
Railways
Union Pacific
Schools
Fremont Unified
Waterways
Scott Creek, Flood Channel B, Old Coyote Creek
Township
5S
Range
1W
Section
36
Base
Diablo
Other Location Info
Industrial Planning Area
Notice of Determination
Approving Agency
California State lands Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.