Infineon Legacy Raceway Tire Removal Project, Sonoma County, California

4 Documents in Project

Summary

SCH Number
2008042111
Lead Agency
California Department of Resources Recycling and Recovery
Document Title
Infineon Legacy Raceway Tire Removal Project, Sonoma County, California
Document Type
NOD - Notice of Determination
Received
Posted
7/23/2009
Document Description
Removal of approximately 10 waste tire piles with an estimated 10,000 individual tires originally deposited under the guidance of the U.S. Soil Conservation Service to prevent soil loss in naturally erosive gullies. The waste tires will be removed and transported to disposal/recycling facilities. After removal of the waste tires the project will restore the gullies to their original natural conditions matching downstream and nearby channel features that do not contain tires. All ground disturbances will be restored to existing grade and stabilized using current standards and methods to prevent immediate post project erosion and soil loss.

Contact Information

Name
Wes Mindermann
Agency Name
California Integrated Waste Management Board
Contact Types
Lead/Public Agency

Location

Cities
Sonoma
Counties
Sonoma
Cross Streets
Highways 121 and 37
Zip
95476
Total Acres
< 5
Parcel #
068-100-057 and 058
State Highways
121, 37
Railways
No
Airports
No
Schools
No
Waterways
Napa River, San Pablo Bay
Township
4N
Range
5W
Base
MDB&M

Notice of Determination

Approving Agency
California Integrated Waste Management Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print