California State University East Bay, Certify the Final EIR and Approve the Campus Master Plan Revision

8 Documents in Project

Summary

SCH Number
2008042100
Lead Agency
California State University, Hayward
Document Title
California State University East Bay, Certify the Final EIR and Approve the Campus Master Plan Revision
Document Type
NOD - Notice of Determination
Received
Posted
3/18/2010
Document Description
The proposed parking structure will be six-levels and will provide approximately 1,100 new parking spaces. Vehicular access will be provided with two ingress and egress access points on West Loop Road. The Parking Services Buildings (1,600 GSF) will include a lobby with service counter, administrative offices and restrooms. The site is approximately 1.5 acres, with an angled southwest corner to maintain service road access. Based on the sloping topography of the proposed site, the project includes two vehicular access ramps to connect the structure to adjacent roadways. A pedestrian bridge will provide a safe pathway to the campus and facilitate vehicle ingress and egress. The project will provide the necessary infrastructure for a future photovoltaic panel system to be located on the top floor of the parking structure.

Contact Information

Name
Linda Dalton
Agency Name
California State University Trustees
Contact Types
Lead/Public Agency

Location

Cities
Hayward
Counties
Alameda
Cross Streets
Harder Road and West Loop Road
Zip
94542
Total Acres
360
Parcel #
445-0280-001-005; 081D-2080-001
State Highways
SR 238
Schools
Anchor Education, Inc.
Township
3S
Range
2W
Section
23
Base
Hayward

Notice of Determination

Approving Agency
Trustees
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.