Gaines Parcel Immediate Public Use Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008042073
- Lead Agency
- California Department of Parks and Recreation
- Document Title
- Gaines Parcel Immediate Public Use Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/4/2008
- Present Land Use
- Public Facilities and Open Space
- Document Description
- The Department of Parks and Recreation proposes to provide immediate public access facilities on the Gaines Parcel, a new acquisition located on the west side of the Butte City Bridge State Route 162 crossing of the Sacramento River. The parcel will be added to Colusa-Sacramento River State Park. The following is a brief summary of the proposed work: - Install 22 parking spaces, including two spaces that are Americans with Disabilities Act (ADA) compliant with perimeter vehicle barrier fencing; - Construct two restrooms, one would be ADA compliant; - Construct two ADA compliant drinking fountains; - Create nine picnic sites; - Construct concrete pathways to connect picnic sites, restrooms, and parking; - Remove six acres of existing walnut orchard and temporarily retain 23 walnut trees; - Revegetate with native plants; - Extend electricity from an existing power source to the parcel; - Install a well, 2 hose bibs and irrigation capabilities; and - Install irrigation capabilities to temporarily maintain 23 remaining walnut trees and new native plants.
- Contact Information
-
Patricia DuMont
California Department of Parks and Recreation
Lead/Public Agency
One Capitol Mall, Suite 410
Sacramento, CA 95814
Phone : (916) 445-9081
Location
- Counties
- Glenn
- Cross Streets
- County Road 61 and State Route 162
- Zip
- 95920
- State Highways
- SR 162
- Waterways
- Sacramento River
- Township
- 19N
- Range
- 1W
- Section
- 32
- Base
- MDB&M
- Other Location Info
- City/Nearest Community: Butte City
Notice of Determination
- Approving Agency
- Department of Parks and Recreation
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- California Department of Parks and Recreation Northern Service Center One Capitol Mall - Suite 410 Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.