Lake or Streambed Alteration Agreement (Agreement) No. 1600-2014-0173-R1, East Side Potter Valley Road Rehabilitation/Widening Project

5 Documents in Project

Summary

SCH Number
2008042029
Lead Agency
Mendocino County
Document Title
Lake or Streambed Alteration Agreement (Agreement) No. 1600-2014-0173-R1, East Side Potter Valley Road Rehabilitation/Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
9/2/2014
Document Description
The project involves three encroachments: 1) at Mile Post (MP) 5.23, replace an existing 42-inch metal arch culvert (MAC) with wither: a) a new 42-inch MAC or b) an 8X5-foot concrete box culvert, 2) at MP 5.50, replace an existing 36-inch culvert with a 48-inch culvert and 3) remove up to 0.25 acres of riparian trees (measured in tree canopy area) between P.G&E. power poles 16 and 17, 24 and 26, and 62 and 64. Mitigation for various aspects of the overall project including removal of riparian trees will be accomplished by an approved conservation easement on eight acres in the Potter Valley area.

Contact Information

Name
Rick Macedo
Agency Name
CDFW Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Mendocino
Cross Streets
West Road at South end of project, Eel River Road at North end of project
Zip
95469
Total Acres
~18.25
State Highways
20
Schools
Potter Valley
Waterways
E fork Russian River
Township
17N
Range
11W
Section
17,20,
Base
MDBM
Other Location Info
City/Nearest Community: Potter Valley
Other Information
Section (cont): 21, 28, 29

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print