Issuance of a Standardized Permit Series C to D/K Dixon to Authorize the Storage of Non-RCRA Hazardous Waste in the Storage and Transfer Area for a Period No Lo

2 Documents in Project

Summary

SCH Number
2008042011
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Issuance of a Standardized Permit Series C to D/K Dixon to Authorize the Storage of Non-RCRA Hazardous Waste in the Storage and Transfer Area for a Period No Lo
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2009

Document Description
Operations include the storage and transfer of non-RCRA hazardous waste of Used Oil, Spent Antifreeze, and Oily Water. These non-RCRA hazardous wastes are consolidated in a storage tank farm located in the south side part of the facility. The standardized hazardous waste permit will allow D/K Dixon to store and transfer non-RCRA hazardous wastes of Used Oil, Spent Antifreeze, and Oily Water in a tank system with a maximum capacity of 40,000 gallons of Used Oil, 7,500 gallons of Spent Antifreeze, and 2,500 gallons of Oily Water.

Contact Information
Alejandro Galdamez
Department of Toxic Substances Control
700 Heinz Avenue, Suite 200
Berkeley, CA 94710

Phone : (510) 540-3933

Location

Cities
Dixon
Counties
Solano
Cross Streets
Chevron Way and Midway Road
Zip
95620
Total Acres
17.66
Parcel #
2
State Highways
I-80
Waterways
Sweeny Creek
Township
7
Range
1
Section
32

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
700 Heinz Ave., Suite 200 Berkely, CA 94710

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes