Village Creek Outfall (Lake or Streambed Alteration Agreement No. 1600-2017-0058-R3)
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008042004
- Lead Agency
- Albany, City of (City of Albany)
- Document Title
- Village Creek Outfall (Lake or Streambed Alteration Agreement No. 1600-2017-0058-R3)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/22/2017
- Present Land Use
- Vacant Lots and Institutional Z: San Pablo Commercial; Residential (R-2), Watercourse Overlay District (WC) GP: Residential Commercial and Creek Conservation
- Document Description
- CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0058-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Pat Barrett. Project is limited to removing the existing 8-inch corrugated metal pipe (CMP) and replacing it with an 18-inch high-density polyethylene pipe (HDPE) storm drain pipe.
- Contact Information
-
Joseph Kermish-Wells
CDFW
7329 Silverado Trail
Napa, CA 94558
Phone : 707-944-586
Location
- Coordinates
- 37°53'3.861"N 122°17'53.9658"W
- Cities
- Albany
- Counties
- Alameda
- Cross Streets
- San Pablo Avenue/Monroe Street
- Zip
- 94706
- Total Acres
- 5.3
- Parcel #
- 2692-66-2-6
- State Highways
- 123, I-580, I-80
- Railways
- UPRR, BART
- Airports
- No
- Schools
- 20+
- Waterways
- San Francisco Bay
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 7329 Silverado Trail, Napa, CA 94558
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.