Linden Avenue and Casitas Pass Road Interchange Project (Streambed Alteration Agreement No. 1602-2015-0137-R5 (SAA))

7 Documents in Project

Summary

SCH Number
2008041158
Lead Agency
California Department of Transportation, District 5
Document Title
Linden Avenue and Casitas Pass Road Interchange Project (Streambed Alteration Agreement No. 1602-2015-0137-R5 (SAA))
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2015
Present Land Use
State Highway, Transportation Corridor, Open Space, & Agriculture
Document Description
This proposed project at Carpinteria Creek is to implement the following Project. Construction at Carpinteria Creek would include the following construction elements: 1) replace, widen, lengthen, and raise the northbound and southbound US-101 Carpinteria Creek Bridges; 2) extend Via Real from the current cul-de-sac at the San Roque Mobile Home Park over Carpinteria Creek to Linden Avenue, building a new bridge for Via Real over Carpinteria Creek (including one lane in each direction, one Class II bike path in each direction, and five-foot wide sidewalks on the north side; 3) move the alignment of Via Real closer to US-101; 4) regrade and widen an approximately 535 linear ft section of Carpinteria Creek; 5) widen the width of the bottom of Carpinteria Creek near the ordinary high water marks (OHWMs) from an existing width of approximately 35 ft to a new width of approximately 65 ft; 6) widen the distance between banks from an existing width of approximately 110 ft to a new width of approximately 140 ft; 7) excavate an estimated 5,021 CY of material from the existing Carpinteria Creek channel, including approximately 638 CY of material below the new OHWMs of the widened channel; and 8) install an estimated 4,848 CY of Rock Slope Protection along the restored banks of Carpinteria Creek, and in adjacent areas, including approximately 393 CY of RSP below the new OHWMs of the widened channel. The project will result in impacts to 1,903 acres of impacts to Carpinteria and Franklin Creeks that also includes in-stream wetlands and riparian vegetation. Project will permanently remove 0.537 acre of combined streambed and riparian habitat and temporarily impact 1.366 acres of streambed, wetland, and riparian habitats. The SAA referenced above as issued by CDFW authorizes those impacts as specified above that may occur as a result of project implementation.

Contact Information

Name
Jamie Jackson
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Carpinteria
Counties
Santa Barbara
Cross Streets
Linden Avenue
State Highways
101
Waterways
Frnaklin Creek and Carpinteria Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print