Pepperdine University Debris Basin Relocation Project

7 Documents in Project

Summary

SCH Number
2008041123
Lead Agency
Los Angeles County
Document Title
Pepperdine University Debris Basin Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2016
Present Land Use
MLCP: 11 (Institution and Public Facilities) and M2 (Mountain Lands) / A-1-1-DP (Light Agriculture-one acre minimum required area) and A-2-5 (Heavy Agriculture-five acres minimum required area)
Document Description
CDFW is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (#1600-2015-0236-R5) to the project applicant, Pepperdine University. The project consists of reconfiguration and relocation of the existing Marie Canyon debris basin and the stockpile approx. 400 feet upstream and the filling of the existing debris basin for construction of an expanded recreational area with turf field, restroom/storage facility, and lights, along with the continued retention to the new debris basin, stockpile, and their appurtenant facilities. The project proposes to impact 0.48 acres of streambed/lake, including 0.05 acres of permanent impact to mulefat scrub habitat and 0.15 acres of permanent impact to coastal sage scrub habitat and mitigate with 0.48 acre of creation or restoration and 0.48 acre of enhancement.

Contact Information

Name
Brock Warmuth
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Malibu
Counties
Los Angeles
Cross Streets
Pacific Coast Highway and Malibu Canyon Road
Total Acres
830
Parcel #
M.B. p. 30 parcel 35 and M.B. p. 39, Parcels 7 & 8
State Highways
Hwy 1
Railways
No
Airports
Los Angeles International
Schools
John Webster Elementary
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print