El Carro Well Replacement and Central Zone Pipeline Improvements Project
2 Documents in Project
Summary
SCH Number
2008041118
Lead Agency
Carpinteria Valley Water District
(CVWD)
Document Title
El Carro Well Replacement and Central Zone Pipeline Improvements Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Existing well site within public park.
General Plan: Open Space/Recreation
Document Description
CVWD proposes to replace the non-functional El Carro Well at the existing well site located in El Carro Park and install one new pipe segment and three replacement pipe segments. Pipe segments would mostly be in existing road rights-of-way. Two segments would be in public parks (El Carro Park and Franklin Creek Park). Two concrete channelized creeks would be crossed by pipe segments (Franklin and Santa Monica Creeks).
Contact Information
Name
Charles Hamilton
Agency Name
Carpinteria Valley Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Carpinteria
Counties
Santa Barbara
Cross Streets
El Carro Lane west of Jay Street
Zip
93013
Total Acres
0.17+ linear
Parcel #
004-005-004
State Highways
US 101
Railways
Amtrak
Schools
Howard Carden
Waterways
Franklin and Santa Monica Creeks
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 5 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type Well and pipe)
Local Actions
Coastal Permit, CVWD
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.