Nancy Ridge TM NDP

3 Documents in Project

Summary

SCH Number
2008041111
Lead Agency
City of San Diego
Document Title
Nancy Ridge TM NDP
Document Type
NOD - Notice of Determination
Received
Posted
2/27/2023
Document Description
TENTATIVE MAP (TM) and a NEIGHBORHOOD DEVELOPMENT PERMIT (NDP) for the construction of four light industrial warehouse buildings totaling 89,750 square feet on a 5.35-acre parcel previously approved for a laydown area as part of the Nancy Ridge Business Park, located at 5909 Nancy Ridge Drive (Proposed Project). The Proposed Project also includes vehicular parking and installation of utility infrastructure to City standards. The Proposed Project site is in the IL-2-1 (Industrial-Light) zone of the Mira Mesa Community Plan, Residential Tandem Parking Overlay Zone, Marine Corps Air Station Miramar Airport Influence Area, Accident Potential Zone 2, Airport Environs Overlay Zone, FM Part 77 Notification Area, Environmentally Sensitive· Lands, and Floodway-100 and Floodplain-100 Zones. The Nancy Ridge Business Park Project (Approved Project) was approved by the City of San Diego in 2008. The Approved Project proposed the construction of a paved, non-standard access 30-foot-wide driveway and internal 40-foot wide right-of-way with a sidewalk from Nancy Ridge Drive to an outdoor storage area consisting of two graded pad areas. Both pads were proposed to be covered with Class 2 base gravel material. Evaluation of the Approved Project in the adopted MND included grading of approximately 58,000 cubic yards of cut with a maximum cut height of 34 feet and a maximum cut slope height of 34 feet with a maximum cut slope ratio of 2:1. The Approved Project includes a total fill quantity of approximately 58,000 cubic yards with a maximum fill depth of 36 feet and a maximum fill slope height of 30 feet with a maximum fill slope ratio of 2:1. Due to the topography of the site, the Approved Project includes approximately 2,800 feet of keystone retaining walls to stabilize the proposed step-down, fiat pad areas, and the non-standard driveway. The retaining walls were approved at a maximum height of 31 feet, to be screened with drought tolerant, native plant species that conform to the City's Landscape Technical Manual. The Approved Project also includes installation of drainage, including a Modular Wetland System, an underground storage system, and storm drain. The Approved Project includes construction Best Management Practices (BMPs) and post-construction BMPs consistent with the City of San Diego requirements. In approving the Approved Project, the City also adopted the Nancy Ridge Business Park Mitigated Negative Declaration No. 114358 (adopted MND). The adopted MND determined that, with the incorporation of mitigation measures, the Approved Project would not result in any significant and unavoidable environmental impacts. Pursuant to Public Resources Code Section 21166 and CEQA guidelines 15162 and 15163, the City has determined that: (1) there is substantial evidence that none of the conditions requiring preparation of a subsequent or supplemental EIR or subsequent Negative Declaration/Mitigated Negative Declaration exist, and (2) the City will rely on the previous environmental document, which adequately addresses this project.

Contact Information

Name
Courtney Holowach
Agency Name
City of San Diego
Job Title
Planner
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide, Countywide
Other Information
Tentative Map and Neighborhood Development Permit

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Development Services Department, 1222 First Avenue, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print