Proposed Central Region Elementary School #22, Remedial Action Plan

6 Documents in Project

Summary

SCH Number
2008041088
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Proposed Central Region Elementary School #22, Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2010
Document Description
The project is the implementation of a Remedial Action Plan at the proposed Central Region ES #22. The 4.08 acre site is located in the City of Los Angeles. It is bounded by Bluff Creek Drive to the north, Lot 5 to the east, recreation fields (lot 7) to the west, and a riparian corridor to the south-southeast. It is located west of 405 Freeway, north of the I-105, and south of the I-90. The proposed RAP project is part of a new school construction project of the Los Angeles USD. A proposed remedial action will be conducted in accordance with the RAP to address total petroleum hydrocarbon impacted soil and volatile organic compound impacted soil gas and groundwater. A gas mitigation system will be installed and operated at the Site to mitigate the onsite methane and hydrogen sulfide.

Contact Information

Name
Javier Hinojosa
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Bluff Creek Drive and Playa Vista Drive
Zip
90094
Total Acres
4.08
Parcel #
4211-013-045
State Highways
I-405
Airports
LAX
Township
2S
Range
15W
Section
26
Other Location Info
Playa Vista

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print