Devers-Mirage 115 kV Sub-transmission System Split Project
5 Documents in Project
Summary
SCH Number
2008041087
Lead Agency
California Public Utilities Commission
(CPUC)
Document Title
Devers-Mirage 115 kV Sub-transmission System Split Project
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2011
Document Description
CDFG is executing a Lake or Streambed Alteration Agreement (SAA # 1600-2011-0161-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant: Southern California Edison, represented by Mr. Hazem Gabr., 1218 S. 5th Avenue, City of Monrovia, State of California, 91016, Phone (626) 462-8715. The proposed Project will include installation of two new 115 kV sub-transmission line segments, a loop-in of the existing Devers-Coachella Valley 220 kV transmission line into Mirage Substation, and three 115 kV sub-transmission line reconfigurations. Other components include rearrangements and modifications of sub-transmission line reconfigurations. Other components include rearrangements and modifications of sub-transmission line connections, construction of substation modifications in the cities of Palm Springs, Rancho Mirage, Indian Wells, Cathedral City, Palm Desert, and unincorporated areas of Riverside County, including the Thousand Palms community, and minor modifications to existing telecommunications equipment at the Edom Hill Communications site and the Palm Springs Service Center. The existing Devers 115 kilovolt Sub-transmission System will be split into two separate sub-transmission systems - the Devers 115 kilovolt Sub-transmission System and the Mirage 115 kilovolt Sub-transmission System.
Contact Information
Name
Eric Chiang
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency
Phone
Location
Cities
Cathedral City, Indian Wells, Palm Desert, Palm Springs, Palm Springs, Rancho Mirage, Cathedral City, Palm Desert, ..., Rancho Mirage
Counties
Riverside
Cross Streets
Multiple
Zip
multi
State Highways
I-10, SR 111
Railways
Union Pacific Railroad
Airports
Palm Springs International
Schools
Multiple
Waterways
Whitewater River
Notice of Determination
Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.