Southern California Edison Devers-Mirage 115 kV Subtransmission System Split

5 Documents in Project

Summary

SCH Number
2008041087
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Southern California Edison Devers-Mirage 115 kV Subtransmission System Split
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2010
Document Description
The primary components of the Project include 2 new 115kV subtransmission line segments and a loop-in of the existing Devers-Coachella Valley 220kV transmission line into Mirage substation. Other componenets include rearrangements and modifications of subtansmission line connections and construction of substation modifications.

Contact Information

Name
Eric Chiang
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Cities
Cathedral City, Indian Wells, Palm Desert, Palm Springs, Palm Springs, Rancho Mirage, Cathedral City, Palm Desert, ..., Rancho Mirage
Counties
Riverside
Cross Streets
Multiple
Zip
multi
State Highways
I-10, SR 111
Railways
Union Pacific Railroad
Airports
Palm Springs International
Schools
Multiple
Waterways
Whitewater River

Notice of Determination

Approving Agency
California Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print