Replacement of Two Existing Crosswalks of 24th Street with a New Crosswalk at Pine Street

9 Documents in Project

Summary

SCH Number
2008041070
Lead Agency
City of Bakersfield
Document Title
Replacement of Two Existing Crosswalks of 24th Street with a New Crosswalk at Pine Street
Document Type
NOD - Notice of Determination
Received
Posted
1/2/2018
Present Land Use
(Roadway)/Residential/Residential
Document Description
Construction of a new pedestrian crossing of 24th Street at Pine Street, 700 feet to the west of A Street, as part of the 24th Street Widening Project.

Contact Information

Name
Nick Fidler
Agency Name
City of Bakersfield
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
24th Street from Elm Street to B Street
Zip
93308
Total Acres
0.46
Parcel #
Various
State Highways
58, 178, 99
Railways
BNSF, UPRR
Schools
Franklin ES, Bakersfield
Waterways
Kern River
Township
29S
Range
27E
Section
25
Base
MD

Notice of Determination

Approving Agency
City of Bakersfield
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print