24th Street Improvement Project
9 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008041070
- Lead Agency
- Bakersfield, City of (City of Bakersfield)
- Document Title
- 24th Street Improvement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/13/2016
- Present Land Use
- (Roadway)/Residential/Residential
- Document Description
- The project would widen 24th St. to the north and encompass the SR 99 interchange and auxiliary lane, Oak St./ 24th St. intersection, 24th St. widening to the north, and the 24th St. couplet area (one way section of 23rd and 24th Streets). Widening to the north along 24th St. would add two travel lanes (one in each direction). The proposed roadway alignment would be shifted north of the existing alignment about 17 feet, which would minimize the right of way acquisition on the south side of the 24th St. required for the roadway widening. Impacts include full and partial right-of-way acquisitions and reconstruction of the Carrier Canal on the north and south sides of 24th St.
- Contact Information
-
Nick Fidler
City of Bakersfield
1600 Truxtun Avenue
Bakersfield, CA 93301
Phone : (661) 326-3000
Location
- Coordinates
- 35°22'58"N 119°01'59"W
- Cities
- Bakersfield
- Counties
- Kern
- Cross Streets
- 24th Street from Elm Street to B Street
- Zip
- 93308
- Total Acres
- 0.46
- Parcel #
- Various
- State Highways
- 58, 178, 99
- Railways
- BNSF, UPRR
- Schools
- Franklin ES, Bakersfield
- Waterways
- Kern River
- Township
- 29S
- Range
- 27E
- Section
- 25
- Base
- MD
Notice of Determination
- Approving Agency
- City of Bakersfield
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1600 Truxtun Ave., Bakersfield, CA 93301
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.