24th Street Improvement Project

9 Documents in Project

Summary

SCH Number
2008041070
Lead Agency
City of Bakersfield
Document Title
24th Street Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2014
Present Land Use
Commercial, open space, residential, and mixed-use
Document Description
The project would widen 24th St. to the north and encompass the SR 99 interchange and auxiliary lane, Oak St./24th St. intersection, 24th St. widening to the north, and the 24th St. complete area (one-way section of 23rd and 24th Streets). Widening to the north along 24th St. would add two travel lanes (one in each direction). The proposed roadway alignment would be shifted north of the existing alignment about 17 feet, which would minimize the right-of-way acquisition on the south side of 24th St. required for the roadway widening. Impacts include full and partial right-of-way acquisitions and reconstruction of the Carrier Canal on the north and south sides of 24th St.

Contact Information

Name
Theodore Wright
Agency Name
City of Bakersfield
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
24th Street (SR-58) between Buck Owens Boulevard and M Street
Zip
93301
Total Acres
276.9
Parcel #
multiple
State Highways
SR-178, 99
Railways
Amtrak
Schools
Several
Waterways
Kern River and Carrier Canal
Township
29S
Range
27/28E
Section
19/23

Notice of Determination

Approving Agency
City of Bakersfield and Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print