J Street Drain Project

6 Documents in Project

Summary

SCH Number
2008041057
Lead Agency
Ventura County Watershed Protection District
Document Title
J Street Drain Project
Document Type
NOD - Notice of Determination
Received
Posted
1/13/2015
Present Land Use
Existing drain is maintained by Ventura County Watershed Protection District.
Document Description
As Lead Agency, the Ventura County Watershed Protection District (District) prepared an environmental impact report for the J Street Drain Project (referred to herein as the "approved project"). The District proposed to increase the flow capacity of the existing J Street Drain to accommodate runoff from a 100-year storm event, thereby reducing potential flooding of residential and commercial areas in the cities of Oxnard and Port Hueneme. The Ventura County Board of Supervisors certified the J Street Drain EIR and approved the J Street Drain Project on March 27, 2012. The EIR Addendum was prepared to determine whether the proposed modified project would result in new or substantially more severe significant environmental impacts compared with the impacts disclosed in the certified EIR. The proposed modified project would result in minor changes to the approved project's design for Reaches 2, 3 and 4. Instead of an open channel, the proposed modified project would feature buried box culverts that would allow for landscaping on top. Similar to the approved project, the channel would remain open in Reach 1 from the south side of Hueneme Road south to Ormond Beach Lagoon to avoid impacts to endangered species in the lagoon.

Contact Information

Name
Angela Bonfiglio Allen
Agency Name
Ventura County Watershed Protection District
Contact Types
Lead/Public Agency

Location

Cities
Oxnard, Port Hueneme
Counties
Ventura
Cross Streets
J St and Redwood Avenue to south of Hueneme Road
Zip
93033
Parcel #
Rio De Santa Clara Land Grant
Railways
VCRR
Schools
Yes

Notice of Determination

Approving Agency
Ventura County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print