J Street Drain Project

6 Documents in Project

Summary

SCH Number
2008041057
Lead Agency
Ventura County Watershed Protection District
Document Title
J Street Drain Project
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2012
Present Land Use
Existing drain is maintained by Ventura County Watershed Protection District.
Document Description
The Ventura County Watershed Protection District proposes to increase the flow capacity of the existing J Street Drain to accommodate runoff from a 100-year storm event, thereby reducing potential flooding of residential and commercial areas in the cities of Oxnard and Port Hueneme. The Drain would be maintained according to best management practices identified in the adopted Final Program Environmental Impact Report for Environmental Protection Measures for the Ongoing Routing Operations and Maintenance Program (May 2008). The proposed project also includes a Beach Elevation Management Plan (BEMP). The BEMP identifies a set of threshold environmental conditions that together activate the need for reducing the height of the a short section of sand berm adjacent to the Ormond Beach Lagoon. Once these threshold conditions are observed, a predetermined list of actions would be implemented to ensure the opening of the lagoon outlet if the water level exceeds a target safe elevation and thereby prevent flooding of developed properties.

Contact Information

Name
Angela Bonfiglio Allen
Agency Name
Ventura County Watershed Protection District
Contact Types
Lead/Public Agency

Location

Cities
Oxnard, Port Hueneme
Counties
Ventura
Cross Streets
J St and Redwood Avenue to south of Hueneme Road
Zip
93033
Parcel #
Rio De Santa Clara Land Grant
Railways
VCRR
Schools
Yes

Notice of Determination

Approving Agency
Ventura County Watershed Protect District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print