Barren Ridge Renewable Transmission Project (California Endangered Species Act Incidental Take Permit No. 2081-2015-009-04 (ITP) and Minor Amendment No. 1)

24 Documents in Project

Summary

SCH Number
2008041038
Lead Agency
City of Los Angeles
Document Title
Barren Ridge Renewable Transmission Project (California Endangered Species Act Incidental Take Permit No. 2081-2015-009-04 (ITP) and Minor Amendment No. 1)
Document Type
NOD - Notice of Determination
Received
Posted
5/24/2016
Present Land Use
Multiple Land Uses
Document Description
The project will result in 20 acres of permanent and 137 acres of temporary impacts to desert tortoise (Gopherus agassizii) and Mojave ground squirrel (Spermophilus mohavensis) habitat and is expected to result in incidental take of desert tortoise and Mojave ground squirrel, which are designated as threatened species under the CESA. Amendment No. 1 allows for an alternative to installation of desert tortoise exclusion fencing at a single location identified as WS 8A on Figure 3, extends the timeline in which to complete the HM lands obligation by 7 months, and inserts an additional figure, Figure 3, that depcts the location of WS8A. The ITP, as amended, referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information

Name
Lisa Gymer
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
California City
Counties
Kern, Los Angeles
State Highways
Hwy 5, 14, 58, 210
Waterways
Santa Clara River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print