LADWP Barren Ridge-Haskell Line 1 Transmission Line Project

24 Documents in Project

Summary

SCH Number
2008041038
Lead Agency
Los Angeles Department of Water and Power
Document Title
LADWP Barren Ridge-Haskell Line 1 Transmission Line Project
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2023
Document Description
The project aims to replace 243 existing Lattice Steel Towers (LSTs) transmission structures with stronger LSTs in order to support the additional weight of conductor wire that enables greater transmission capacity. All work would occur within the Applicant's existing BAR-HSK L1 transmission right-of-way. This project required an addendum to a previous EIR.

Contact Information

Name
Alex Lopez
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
California City, Lancaster, Mojave, Santa Clarita
Counties
Kern, Los Angeles
Regions
Southern California
Other Location Info
Approximate northern terminus: Pine Tree Canyon Road, approximately 0.57 miles west of Highway 14, unincorporated Kern County, California. Approximate southern terminus: City Highline Motorway Fire Road, approximately 0.3 miles northeast of its intersection with Forest Route 5N28, Santa Clarita, Los Angeles County, California. Nearest City: Mojave, Kern County, Santa Clarita, Los Angeles County Barren Ridge Switching Station: Section 18, Township 31 South, Range 37 East, MDB&M. Haskell Canyon Switching Station: Section 25, Township 5 North, Range 16 West, MDB&M. Start: Latitude: 35°14'7.71"N and Longitude: 118°3'23.15"W End: Latitude: 34°31'7.29"N and Longitude: 118°30'57.48"W

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.ladwp.com/ladwp/faces/wcnav_externalId/au-p-p-brrtp-FinalEISEIR?_adf.ctrl-state=u68tcvfqm_29&_afrLoop=1187548602198532

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print