Mud Creek Harvest Plan - Streambed Alteration Agreement

Summary

SCH Number
2008039025
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Mud Creek Harvest Plan - Streambed Alteration Agreement
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2008
Document Description
Streambed Alteration Agreement 1600-2008-0025-R2. This project involves the construction of 2 rock dips on Class III watercourses, a rocked ford of a Class II watercourse, the installation of a temporary bridge over a Class I watercourse, the construction of a pair of 2 rock dips on a Class II watercourse, the installation of a temporary "Spittler" type crossing of a Class III watercourse utilizing a 24" diameter corrugated metal/plastic pipe, a Class II skid crossing involving the installation of a temporary bridge over a Class II watercourse, a Class I skid crossing involving the instalation of a temporary bottomless arched pipe, the installation of a rock wall to retain runoff in the northern channel of a Class III watercourse, the construction of a new off-channel waterhole of a Class I watercourse or alternatively creating a new water drafting site in a plunge pool of the Class I watercourse, and the use and renovation of 3 existing waterholes.

Contact Information

Name
Dave Richter
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Plumas

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print