Trinity River Channel Rehabilitation Sites: Channel Rehabilitation Activities

10 Documents in Project

Summary

SCH Number
2008032110
Lead Agency
Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa
Document Title
Trinity River Channel Rehabilitation Sites: Channel Rehabilitation Activities
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2015
Present Land Use
Trinity County's General Plan land use designation includes open space, resource lands, and rural residential
Document Description
This activity is considered to be within the scope of the previously certified Master EIR for channel rehabilitation and sediment management for remaining phase 1 and phase 2 sites = State Clearinghouse #2008032110. The purpose of this Project is to restore aquatic habitat and healthy river functions in the Trinity River. The project is designed to enhance aquatic habitat quality. In-river work will increase habitat complexity via construction of slow water refuge habiats, reconnection of the floodplain with the river, and placement of in-river geomorphic and habitat features. On-shore work will include revegatation of riverine and upland areas with native vegetation.

Contact Information

Name
Gil Falcone
Agency Name
Regional Water Quality Control Board, Region 1 (North Coast), Sa
Contact Types
Lead/Public Agency

Location

Counties
Trinity
Cross Streets
Hwy 299 - multiple
Zip
96024
Parcel #
various
State Highways
Hwy 299
Railways
No
Airports
No
Schools
Douglas City
Waterways
Trinity River
Township
33N
Range
9W
Section
28-30
Base
MDB&M
Other Location Info
City/Nearest Community: Douglas City and Junction City

Notice of Determination

Approving Agency
North Coast RWQCB
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print