Loyalton WWTF Improvement Project

3 Documents in Project

Summary

SCH Number
2008032018
Lead Agency
City of South Lake Tahoe
Document Title
Loyalton WWTF Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2009
Document Description
The proposal project entails the horizontal directional drill (HDD) installation of a 6" and 8" pipelines (4" and 6" interior diameter) under Smitchneck Creek. No water will need to be diverted. No rip rap, culverts will be necessary. The project does not entail open trench excavation; therefore, excavation volume calculations are not included. The HDD entails equipment mobilization on the west side of the stream in an open disturbed area. A small diamtere pilot hole located ~15 ft under the streambed is first drilled from one end of the alignment to the other. Subsequently the bore is enlarged to accommodate pipeline insertion. The 2 pipes will be placed one above the other and seperated by ~10 inches. A redundancy pipe is necessary to keep effluent moving should the main 8 inch pipe clog at some point. The HDD operation will avoid the discharge of water, drilling mud and cuttings to the adjacent land during the construction process. The Contractor shall provide equipment and procedures to maximize the recirculation or reuse of drilling mud and minimize waste. All excavated pits used in the drilling operation shall be lined by Contractor with heavy-duty plastic sheeting and sealed joints to prevent the migration of drilling fluids and/or ground water.

Contact Information

Name
Gary L. Hobgood
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Lake Tahoe Boulevard and Julie Lane
Zip
96150
Total Acres
34.6
Parcel #
032-311-10, 11
State Highways
89 and 50
Airports
Lake Tahoe
Schools
South Lake Tahoe High School
Waterways
Lake Tahoe, Upper Truckee River, Angora Creek
Township
12N
Range
18E
Section
8
Base
MDB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print