PA 08-008 Peninsula Station Spar

2 Documents in Project

Summary

SCH Number
2008032002
Lead Agency
City of San Mateo
Document Title
PA 08-008 Peninsula Station Spar
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2008
Present Land Use
Transit Oriented Development
Document Description
The applicant, Mid-Peninsula Housing Coalition, proposes to demolish the Goodyear automobile tire shop and the Immediate Care medical office building, and construct a 4-story mixed-use building with 68 affordable residential units and approximately 2,917 square feet of commercial space. The 68 affordable units will be rented to low, very low, and extremely low income families in a mix of one, two, and three bedroom units ranging from 689 to 1,121 square feet in size. In addition to the residential units, indoor amenities include a computer lab/community room, gym/community room, and laundry room. Outdoor residential amenities include a half basketball court, tot lot and community garden area. The 2,917 square foot commercial space located at the southwesterly corner of the building does not currently have a proposed tenant; however it has been designed for a tenant to occupy the entire space or to be broken up into three separate commercial spaces with their own individual entrances off of El Camino Real. Parking will be located in a below grade parking garage, accessed from South El Camino Real, with a capacity of 121 parking spaces. The 121 parking spaces will consist of 101 residential reserved parking spaces and 20 commercial/guest parking spaces. Additionally, the use of tandem parking spaces has been utilized for 14 of the reserved residential spaces.

Contact Information

Name
Kenneth Chin
Agency Name
City of San Mateo Planning Division
Contact Types
Lead/Public Agency

Location

Cities
San Mateo
Counties
San Mateo
Cross Streets
S. El Camino Real/28th Avenue and S. El Camino Real/31st Avenue
Zip
94403
Total Acres
0.99
Parcel #
039-351-170, 180
State Highways
101, 92
Railways
Caltrain Railroad Tracks

Notice of Determination

Approving Agency
City of San Mateo
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print