Tulare District Hospital Expansion - Phase 1
3 Documents in Project
Summary
SCH Number
2008031119
Lead Agency
Tulare Local Healthcare District
Document Title
Tulare District Hospital Expansion - Phase 1
Document Type
NOD - Notice of Determination
Received
Posted
2/18/2009
Document Description
Construction of a new 5-floor (4 stories above grade and one below grade basement floor) hospital tower south of and connected to the existing 3-story hospital tower with a helipad on the roof. The new tower will bring hospital into conformance with state seismic safety regulations increasing licensed beds from 116 to 143. Also proposed are: several on-site building demolitions and closure of a one block street segment and realignment of another street to allow parking area reconfigurations for additional stalls. Three City land use entitlements are required.
Contact Information
Name
Shawn Bolouki
Agency Name
Tulare Local Healthcare District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Tulare
Counties
Tulare
Cross Streets
Cherry Street, Merritt Avenue, Gem Street, Terrace Avenue, Auburn Street
Zip
93274
Total Acres
11.53
Parcel #
170-110-018 main property, others
State Highways
99, 63, 137
Railways
SPRR
Schools
Garden St. Elementary and Cherry Middle
Township
20S
Range
24E
Section
2
Base
MDB&M
Notice of Determination
Approving Agency
Tulare Local Health District Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.