Charnock Well Field Restoration Project

5 Documents in Project

Summary

SCH Number
2008031109
Lead Agency
City of Santa Monica
Document Title
Charnock Well Field Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
12/2/2008
Document Description
The project involves implementation of a water treatment system and other improvements that would help to remove groundwater contamination from the Charnock groundwater sub-basin and restore this resource as a water supply for the City of Santa Monica. The project involves implementation of a water treatment system and other improvements that would help to remove groundwater contamination from the Charnock groundwater sub-basin and restore this resource as a water supply for the City of Santa Monica. Improvements are proposed at two existing City-operated water service facilities; the Charnock Well Field site and the Santa Monica Water Treatment Plant (SMWTP). The improvements proposed at the Charnock Well Field site involve the installation of a Granular Activated Carbon (GAC) absorption system to treat contaminated groundwater from three wells within the Charnock well field. The proposed improvements at the SMWTP facility include demolition of three onsite structures and installation of a greensand filtration facility, reserve osmosis facility, air striping decarbonators, chemical storage and feed facilities for disinfection and fluoridation and electrical upgrades. The treatment process includes filtration using greensand filters to remove iron and manganese and a softening system utilizing reverse osmosis membrane technology.

Contact Information

Name
Mark Cuneo
Agency Name
City of Santa Monica
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Westminster Avenue and Sawtelle Avenue
Zip
90066
Total Acres
17
State Highways
I-405
Airports
Santa Monica
Schools
Windward School
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Santa Monica
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print