Proposed 2008 PM2.5 Plan

3 Documents in Project

Summary

SCH Number
2008031077
Lead Agency
San Joaquin Valley Air Pollution Control District
Document Title
Proposed 2008 PM2.5 Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/7/2008
Document Description
The 2008 PM2.5 Plan presents the San Joaquin Valley Air Pollution Control District's strategy for achieving the National Ambient Air Quality Standards (NAAQS) for particulate matter with a diameter of 2.5 microns or less (PM2.5). After approval by the California Air Resources Board (ARB), the Plan will be sent to the U.S. Environmental Protection Agency (EPA) for review. Following receipt of the Plan, the EPA must find the Plan complete within six months of its receipt. As required by the federal Clean Air Act (CAA) Section 110k, the EPA must act on the Plan within one year of finding the Plan complete. EPA approval of the Plan places it in the State Implementation Plan (SIP) as required by the CAA and the EPA's Clean Air Fine Particle Implementation Rule, Final Rule (72 FR 20586-20667). In addition to meeting the requirements of the CAA and containing measures needed to attain the NAAQS as expeditiously as practicable, this SIP includes the latest technical information, including emissions inventory, monitoring data, and computer modeling results. The Plan is divided into several chapters, with supporting documents provided as appendices.

Contact Information

Name
Jessica Willis
Agency Name
San Joaquin Valley Air Pollution Control District
Contact Types
Lead/Public Agency

Location

Counties
Fresno, Kern, Kings, Madera, Merced, San Joaquin
Cross Streets
San Joaquin Valley Air Basin

Notice of Determination

Approving Agency
San Joaquin Valley Air Pollution Control District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No