Addendum to the Wilmington Waterfront Development Project Environmental Impact Report

4 Documents in Project

Summary

SCH Number
2008031065
Lead Agency
Port of Los Angeles
Document Title
Addendum to the Wilmington Waterfront Development Project Environmental Impact Report
Document Type
NOD - Notice of Determination
Received
Posted
10/8/2024
Document Description
The Addendum modifies the Wilmington Waterfront Development (WWD) project description to include the re-designed pedestrian bridge with a cable-stayed concrete pedestrian bridge, which is now proposed to extend to the Wilmington Waterfront Promenade. Other features of the bridge include: 12-acre open green space over the rail lines; sundial feature at entry plaza; retaining wall along western project limit; street improvements; public restroom building; historic walk; pathways; playground equipment; landscaping; an amphitheater; and parking reduction and addition of electric vehicle (EV) charging stations. Additional Project construction and site preparation activities include building demolition; site remediation; utility removals/relocations and street vacation. Street changes would include proposing Broad Avenue to become a roundabout; and streetscape and pedestrian enhancements on C Street. The Addendum also discloses other changes to the WWD project that are not within the Avalon Pedestrian Bridge Project footprint: the WWD project will no longer include the extension of the Waterfront Red Car Rail Line or the adaptive reuse of the 14,500-square-foot building located on the Bekins storage property as a Waterfront Red Car Museum; construction and operation of an approximately 1-acre park for passive recreation; and Los Angeles Department Water and Power (LADWP) bulk storage tank capacity relocation to the Olympic tank site.

Contact Information

Name
Celia Sanchez Zelaya
Agency Name
Port of Los Angeles
Job Title
Planning Assistant
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Southern California
Zip
90744
Other Location Info
Avalon Waterfront District, San Pedro, Port of Los Angeles, County of Los Angeles

Notice of Determination

Approving Agency
Port of Los Angeles
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.portoflosangeles.org/environment/environmental-documents

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print